I made a trip over to City Island to take some more photos of the construction site at Commerce Bank Park. This trip was considerably warmer then my previous trip.
Enjoy…
Commerce Bank Park Construction site. The left field area is where the major construction is taking place at this point.
Large drill used to drill down to the river rock.
Oversized drill bit.
More construction equipment.
This view shows various construction supplies. From this view you can see the large mound of dirt has been removed.
View looking towards home plate. You can see various construction equipment and supplies. This view also shows that the large mound of dirt has been removed.
The Giant Foods, Time and Temp sign has been removed.
2009 will be the final year for the current set up of GA seating. It will be renovated as part of Phase 2 of the construction process which is scheduled to begin after the 2009 season.
The Left field area is where the major construction is going on at this point. Construction is well underway for the building of the new a new 8,600 square foot Operations Building which will house the Senators front offices, ranger, security, first aid and the new box office along with the new Senators souvenir store, concession stand, and public rest rooms.
View of the Right Field construction area. Show the outfield wall and the bull pen have been removed. This will make way for the new outfield wall, bull pen, bar, left field seating area and an upgraded scoreboard.
I'm having a small problem with Flickr right now but once it is resolved all the higher resolution, larger size photos will be available for viewing on there too (Senators Renovations).
EDIT: Photos are available on Flickr(Senators Renovations).
3 comments:
GREAT photos, Will!
Thanks!!
Jane
Good Stuff!
You have a nice blog. Good photos.
Post a Comment